KWC Logo


...
 

    The Official website of City Government     

White Bar Spacer
 

 

 

 

What's New

Our City
Agendas
Departments
Boards & Committees
Job Opportunities
Clean Key West
Code Of Ordinances
City Directory
City News
Calendars
Multimedia
Site Index/Search
General FAQ's
Links
Awards
Home

City Marina at Garrison Bight


City Marina is located at:
24-33.606 N
81-47.054 W

 

Directions to marina by road:

City Marina is located in Garrison Bight near the center of the island, on its north side. Although the marina not located at the southern end of US 1, it is not far away. The marina is on the corner of South Roosevelt Boulevard and Palm Avenue. When approaching Key West on US 1, stay to the right; turn on to South Roosevelt Boulevard. This rout will take you along the very edge of the island and offers wonderful vistas of the Back Country with its extensive flats and mangrove islands. Palm Avenue third light on South Roosevelt Boulevard. The City Marina Sign is on the right at this intersection. Drive through the intersection and enter the marina parking lot just past the sign.

 

Directions by water Gulf of Mexico:

Enter Key West waters at Buoy #1 North West Passage. At Buoy #19 North West Passage, turn eastward to the Key West Main Ship Channel, then north to Main Ship Channel #31. Enter Fleming Key Cut eastward to Garrison Bight Channel # 21, then southward to enter Garrison Bight.

Note: Fleming Key Bridge (over Fleming Key Cut) has a vertical clearance of 18 feet, Garrison Bight Channel has a controlling depth of 4.5 feet at Trumbo Point, and power lines restrict mast height with a 50-foot clearance at the entrance to Garrison Bight (NOAA Chart 11447). Vessels unable to pass under the Fleming Key Bridge may proceed northward from Main Ship Channel Buoy # 31 to Garrison Bight Channel Buoy # 3 and sail around the northern end of Fleming Key then into Garrison Bight as above.

 

Directions by water Atlantic:

Proceed westward down Hawk Channel to Key West Main Ship Channel Buoy #12 then northward to Main Ship Channel #31. Enter Fleming Key Cut eastward to Garrison Bight Channel # 21, then southward to enter Garrison Bight.

Note: Fleming Key Bridge (over Fleming Key Cut) has a vertical clearance of 18 feet, Garrison Bight Channel has a controlling depth of 4.5 feet at Trumbo Point, and power lines restrict mast height with a 50-foot clearance at the entrance to Garrison Bight (NOAA Chart 11447). Vessels unable to pass under the Fleming Key Bridge may proceed northward from Main Ship Channel Buoy # 31 to Garrison Bight Channel Buoy # 3 and sail around the northern end of Fleming Key then into Garrison Bight as above.

 

Back to main Port Operations menu

Port Comments/Feedback

Amenities

Board

Contact

Directions

Photo Gallery

Rates

Reservations

Vessel Requirements